The neighbourhood of Augustenborg, during the 1980s and 1990s an area of social and economic decline, was frequently flooded by an overflowing drainage system. Between 1998 and 2002 it was regenerated.
Se encuentra usted aquí
Casos Prácticos
Además, en esta publicación puedes conocer una selección de los casos prácticos de adaptación con algunas de las prácticas más representativas.
Aviso: Las opiniones y documentación aportadas en los casos prácticos son de exclusiva responsabilidad del autor o autores de los mismos.
Otros Casos Prácticos
This case study describes the flood risk management plan and the related restoration of a formerly canalized eight kilometres stretch of the Isar river in the city of Munich (the so called “Isar Plan”).
At Nijmegen, the Waal River bends sharply and narrows. This creates a bottleneck, which often caused flooding of the historic city centre of Nijmegen, located on the south bank of the Wall.
The increasing exposure to floods is a consequence of the river regulation and land reclamation works that shaped the landscape in the Tisza River floodplain.
Climate change impacts are expected to strongly impact the Madrid region and include extreme heat in summer, water scarcity and occasional heavy rainfall.
IRRINET is an IT irrigation system aiming to advise farmers on efficient water management.
The Albert canal in the eastern part of Flanders connects the industrial zones around Liege with the harbour of Antwerp. Ships can continue their way at both ends of the canal: via the river Scheldt to the Netherlands and via the river Meuse to France.
The old office building at Groot Willemsplein, Rotterdam, dating back to the 1940’s, was renovated to give it a new life with commercial functions on the ground floor and flexible office spaces at the other floors.
As a result of sloped topography and impermeable ground surface, the Gomeznarro Park in Madrid was affected by erosion during heavy rainfall events, and the surrounding residential areas suffered from flash flooding.