Coastal protection by managed realignment, Titchwell Marsh

Titchwell Marsh lies towards the western end of the North Norfolk coast in UK. It forms a key part of the North Norfolk Coast Special Protection Area (SPA) and Special Area of Conservation (SAC). The freshwater and brackish habitats at Titchwell are protected by seawalls. However, these walls would have been in danger of not being able to withstand the next few years due to coastal erosion and rising sea levels.

The economics of managing heavy rains and stormwater in Copenhagen – The Cloudburst Management Plan

To combat the impacts of cloudbursts, the City of Copenhagen developed a Cloudburst Management Plan in 2012, which is an offshoot of the Copenhagen Climate Adaptation Plan. The Plan outlines the priorities and measures recommended for climate adaptation including extreme rainfall. The City carried out an overall assessment of the costs of different measures (traditional vs different options including adaptation measures), the cost of the damages despite the measures and resulting financial impact.

Tamera water retention landscape to restore the water cycle and reduce vulnerability to droughts

Tamera, a farm of 154 ha, is located in the most arid region of Portugal (Alentejo). This area has shown significant trends of increasing erosion and desertification. Only a few decades ago, the Alentejo was a region where the streams flowed with water all year round, even in summer. Today the streams swell only during the rainy season and afterward they become dry again. The system has fallen completely out of balance and climate change is expected to exacerbate the situation.

Room for the River Waal – protecting the city of Nijmegen

At Nijmegen, the Waal River bends sharply and narrows. This creates a bottleneck, which often caused flooding of the historic city centre of Nijmegen, located on the south bank of the Wall. After the floods of 1993 and 1995 and faced with increased risk of flooding due to climate change, the city of Nijmegen decided to give more room to the Waal River, at the same time protecting nearby natural habitats and providing recreational space.

Kruibeke Bazel Rupelmonde (Belgium): a controlled flood area for flood safety and nature protection

The Kruibeke Bazel Rupelmonde (KBR) Controlled Flood Area (CFA) is a key component of the Belgian Sigma Plan for the Scheldt Estuary. The Sigma Plan is an integrated flood protection plan that combines dikes, seawalls and flood areas to protect approximately 20,000 hectares of land from flooding.

Isar-Plan – Water management plan and restoration of the Isar river, Munich (Germany)

This case study describes the flood risk management plan and the related restoration of a formerly canalized eight kilometres stretch of the Isar river in the city of Munich (the so called “Isar Plan”). Still in the beginning of the 19th century, the Isar was a typical wild alpine river with wide gravel islands and sandbanks and a constantly changing riverbed. In the middle of the 19th century after repeated flooding suffered by the Lehel, Au and Thal districts in Munich, hydraulic regulation began, and the riverbed was canalized.

Implementation of the integrated Master Plan for Coastal Safety in Flanders

The Flemish coast is intensively used by many actors, embracing coastal towns, commercial ports connected to industrial areas, leisure marinas and touristic activities. It is exposed to flooding due to storm events and sea level rise. In 2007, the Flemish Government, after a safety test revealing an insufficient protection of the coast, started the elaboration of an Integrated Master Plan for Coastal Safety that was finally approved in June 2011.

Saltmarsh recreation by managed realignment, Hesketh Out Marsh – UK

Hesketh Out Marsh is one of the biggest managed realignment projects in the UK and is one of the country’s most important estuary habitats for birdlife. The original saltmarsh was isolated from the estuary in 1980 by the creation of an outer wall, and was used for growing crops. With the sea level rising, it was necessary to create stronger sea defences. By a process known as “managed realignment”, seawater has been let back in to flood the land, re-creating saltmarsh and providing space for nature.

The refurbishment of Gomeznarro park in Madrid focused on storm water retention

As a result of sloped topography and impermeable ground surface, the Gomeznarro Park in Madrid was affected by erosion during heavy rainfall events, and the surrounding residential areas suffered from flash flooding. In response to these problems, in 2003 complex works aiming at improving the natural drainage and rainwater retention were carried out in the park.