You are here
Case studies
Furthermore, in this publication you can find a selection of adaptation case studies with some of the most representative practices.
Note: The views and documentation provided in the case studies are the sole responsibility of the author(s) of the case studies.
5061
4801
4490
4354
4351
Other Case studies
This case study considers a Finnish example of replacing overhead lines with underground cabling. The same strategy is also applied in other European countries. Elenia is the second largest electricity distribution system operator in Finland.
Bratislava has received funding from “EEA Grants and Norway Grants” (hereafter called EEA Grants) for an urban climate adaptation project.
The City of Växjö is situated in the southern part of Sweden, surrounded by forests and lakes. As many parts of the central city of Växjö were built upon wet and swampy areas they are vulnerable to floods after heavy rainfall events.
As a Mediterranean coastal city, Barcelona is particularly vulnerable to climate change. Its high population density also magnifies the local heat island effect which causes an array of health and environmental challenges.
This case study considers a Finnish example of replacing overhead lines with underground cabling. The same strategy is also applied in other European countries. Elenia is the second largest electricity distribution system operator in Finland.